Frequently asked questions
Straight answers to common generator questions.
These are general planning answers, not a substitute for assessing your specific property or equipment.
Installation · Service · Maintenance · Coverage
How do I know what size generator I need?
Sizing begins with the loads you want to support, including equipment that draws extra power during startup. A recommendation should consider how those loads overlap and the electrical context of the property.
Should I back up the whole property or selected circuits?
Either approach may be practical. The decision depends on your outage priorities, electrical loads, budget, and site conditions. Defining essential and optional loads is a useful first step.
What affects where a standby generator can go?
Potential placement can be shaped by equipment requirements, property lines, openings, electrical service, fuel source, access, noise considerations, and applicable local rules. The actual site must be assessed.
Can you service an existing generator?
Existing-system inquiries are welcome. Share the equipment information, current symptoms, location, and service history you have. Availability and feasibility depend on the specific system.
Why does my generator exercise but not power the house?
An exercise cycle and an actual transfer event are different conditions. The generator, transfer equipment, controls, and electrical context may all need consideration. Avoid unsafe testing and request an assessment.
How often does a generator need maintenance?
Intervals depend on the equipment, runtime, age, environment, and manufacturer instructions. Maintenance should follow the documentation for the installed system rather than a universal schedule.
Do you offer emergency or 24/7 service?
No after-hours or emergency availability is represented on this site. Scheduling and response timing are confirmed for each request.
Which generator brands do you work on?
No manufacturer relationships or brand coverage are claimed here. Provide the make, model, and serial information so compatibility and availability can be confirmed.
Do generator projects require permits?
Requirements vary with the work and jurisdiction. Electrical, fuel, placement, and inspection requirements should be confirmed for the actual project.
What areas are covered?
The primary focus is Farmington and Farmington Hills. Nearby communities may be considered based on location, project scope, and scheduling.
A practical next step
Let’s plan the right backup-power approach.
Tell us what you want to keep running and where the project is located. We’ll start with the right questions.